Ilham Aliyev attended the opening ceremony of the bridge over the Ganjachay River after its restoration - - PHOTO

Ilham Aliyev attended the opening ceremony of the bridge over the Ganjachay River after its restoration - PHOTO

Construction and repair of roads, crossings and bridges are among the main priorities among the construction and landscaping works in Ganja. Reconstruction of five bridges over the Ganjachay River has been completed recently.

On June 24, President of the Republic of Azerbaijan Ilham Aliyev and First Lady Mehriban Aliyeva got acquainted with the work done on these bridges.

It was noted that one of these five bridges - the bridge at the intersection of Museyib Bagirov Street with the Ganjachay River - was built in 1986, and the other four were built in the 1950s. The bridges were completely worn out and in a dangerous condition for traffic. Taking this into account, on May 16 last year, the head of state allocated funds from the President's reserve fund for the restoration of 5 bridges at the intersection of Shah Ismayil Khatai and Nizami Ganjavi avenues, Museyib Bagirov, Mirza Abbas Abbaszadeh and Alovsat Mammadov streets in Ganja. He signed an order to allocate 6.4 million manat to the agency. Due to these funds, the repair work on the bridges was completed in an optimal time. All bridges, railings, lower and upper parts of the riverbed, Reinforced concrete reinforcement works were carried out on the right and left bank slopes, wheelbarrows were installed on both sides of the carriageway, and sidewalks were repaired. Thus, from now on, both pedestrians and cars will be able to move safely over these bridges.

The head of state was also informed about the completed roads. It was noted that the reconstruction of the 5-kilometer section of the Ganja-Kalbajar-Lachin highway will play a major role in the development of tourism in the region and improve access to Ganja. The 12.7-kilometer-long Yenikend-Kober-Garaagajli highway has been reconstructed in Samukh region as part of the reconstruction of inter-village and inter-settlement roads. This road has covered 3 settlements and facilitated the movement of thousands of people. In parallel, the existing water pipes under the road were restored, and new ones were installed where necessary. As part of the project, a new bridge was built on the 11th kilometer of the road in the area called "Bloody Gobu". 

 

 
 ( Sos.şəbəkədə gedən yazışmanin FOTO-ƏKSİndə olan qramatik və məzmun səhvlərinə görə redaksiya məsuliyyət daşımır ) 
 Bütün hüquqlar qorunur ! Xəbərlərdən istifadə edərkən    www.AZpress.AZ    saytına istinad zəruridir !